Tube | Lights | Light Bulbs & Tubes
Hong Kong
Booth: 1D-B20 | Hall of Aurora
Product Specification
Model No.

L05G

Brand

ERVAN

Minimum Order Quantity

10

Type of Payment

TT

Port

Shenzhen

Colour

3000K~7000K

Size

2FT 3FT 4FT 5FT

Voltage(V)

100~240V AC

Certification

CE, FCC, LVD, RoHS, UL, VDE

Wattage(W)

18W

Warranty

5 year

Base Type

G13

Body Material

Aluminum, Polycarbonate (PC)

Power Source

AC

Including Bulbs

Yes

Customized

Yes

Product Description
  • Latest lockable rotating end cap (patent).
  • Isolated power supply.
  • Europe safety wired.
  • One end power.
  • PC cover: transparent/frosted available.
  • Certificate: TUV, UL,VDE, DLC
  • Power: 20W.
  • Power energy saving: ≥80%.
  • Luminous: 2300lm ± 10%.
  • LED number: 216pcs.
  • Input voltage: AC 100 to 240V.
  • CRI: ≥80.
  • Luminous efficiency: 115lm/W.
  • Operating temp.: -20°-40°.
  • Power factor: ≥0.95.
  • Power efficiency: 0.89.
  • Operating frequency: 50 or 60Hz.
  • Input current: 58mA.
  • Color temperature: 2700-3500K (warm white); 4000-4500K (daylight white); 5000-6000K (pure white); 7000-8000K (cool white).
  • Beam angle: 120°.
  • Life span: 50,000 hours.
  • Net weight: 368.2g.
  • Dimension: Φ26 x 1198 (4ft).
  • Packaging: 1pc/box, 50pcs/ctn.
  • Carton measurement: 135 x 48 x 26cm.
  • Latest lockable rotating end cap (patent).
  • No mercury.
  • Isolated power supply (very safe).
  • PC lens: clear/frosted.
  • Material: aluminum + high strength PC.
  • Light source: SMD 3528/2835 high quality LED.
  • Warranty: 5 years.
  • Delivery time: 10 days for samples, and 20 days for mass production.
  • Payment: L/C, T/T.
  • Production capacity: 30,0000pcs/month.
  • MOQ: 100pcs.
  • Application: offices, shopping malls, railway stations, airports, factories, etc.
  • Simple replacement for traditional fluorescent tubes.
  • When LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
  • Electronic ballast must be by-passed by a registered electrician.
Production Lead Time

8 days