T8 LED Tube Light | Lights | Light Bulbs & Tubes
Hong Kong
Product Specification
Model No.

L05G

Brand

ERVAN

Minimum Order Quantity

100 pc(s)

Type of Payment

T/T, L/C, Western Union

Port

Shenzhen

Colour

White

Size

26 x 1198mm

Product Description
  • Latest lockable rotating end caps.
  • Power: 20W.
  • Power saving: ≥70%.
  • Luminous: 2000lm±10%.
  • LED number: 216pcs.
  • Input voltage: AC 100 to 240V.
  • CRI: ≥70.
  • Luminous efficiency: 100m/W.
  • Operating temp.: -20°C to 40°C.
  • Power factor: ≥0.95.
  • Power efficiency: 0.85.
  • Operating frequency: 50 or 60Hz.
  • Input current: 58mA.
  • Color temperature: 2700-3500K (warm white); 4000-4500K (daylight white); 5000~6000K (pure white); 7000-8000K (cool white).
  • Beam angle: 120°.
  • Life span: 50,000h.
  • N.W.: 368.2g.
  • Dimension: Φ26 x 1198 (5ft).
  • Packaging: 1pc/box, 50pcs/ctn.
  • Carton measurement: 135 x 48 x 26cm.
Advantages:
  • With lockable rotating end cap.
  • LED's maintain flux is up to 6.8lm/W.
  • Significant energy savings.
  • Maintenance free.
  • Mercury free.
  • Superior light quality.
  • Wide input: AC110-240V.
  • Shock/vibration resistant.
  • Plastic end caps ensure to pass 4000V HI-POT test.
  • Special circuit design, each LED work separately, avoiding the single broken LED influence problem.
  • Isolated power supply.
  • European safety wired.
  • Saving 70% on energy costs.
  • UL, TUV (LVD/EMC) certificate.
  • L05G is our hottest selling, most successful and most beautiful product, which is most popular in the world market thanks to its unique design on the lockable rotating end caps and blue shining ring.
  • It is perfect choice for the replacement of all the traditional tubes.
Installation:
  • Note: make sure the power is turned off before installation.
  • When the led tube is replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse.
  • Attention: only suitable for magnetic ballast, not electronic ballast.
  • Electronic ballast must be by-passed by a registered electrician.
Production Lead Time

30 days