LED UGR<19 linkable design lamp (DB66) | Lights
LED UGR<19 linkable design lamp (DB66)
Mainland China
Booth: 1A-D18 | Hall of Aurora
Product Specification
Applicable

Commercial, Hotel Hall

Voltage(V)

AC200-240V

Is Dimmable

Yes

Certification

CE, SAA, RoHS

Wattage(W)

36W 42W 50W 60W

Body Material

Chromium, Aluminum, Polycarbonate (PC)

Body Colour

White

Port

Shenzhen

Type of Payment

T/T, L/C, Pay Pal

Install Style

Flush Mount

Model No.

DB66A, DB66B

Minimum Order Quantity

1 carton

Style

Modern

Power Source

AC

Colour

white, black

Product Description

60°、140° Beam angle,up and down,up 30%,down 70%,

IP20, UGR<19, DIM,DALI,0-10V

PF0.9,CRI80

3000K 4000K 5000K 5700K

Size: L1204xW56xH75mm

L1504xW56xH75mm


The DB66 is a new linkable design light. Adopt high lumen efficiency SMD LED with even light output, the aluminum light body providing excellent thermal management. Pendant with steel rope, pendant with a round ceiling plate, surface mounted, wall-mounted, recessed and track installation are all available. With Corner/ Cross/ Straight/ T shaped connectors for multiple shape design.


DB66A Features:

1. Multiple installations: Pendant/surface mounted/wall-mounted/recessed/Track.

2. Modular design with convenient replacement.

3. High lumen efficiency,110lm/w.

4. Interchangeable CCT(3000/4000/5700k) with a slide switch.

5. DALI, 0-10V dimming for options.

6. With emergency function available.

7. Up and down light effect for wall mount and pendant installation.

8.With Corner/ Cross/ Straight/ T shaped connectors for multiple shape design.


DB66B Features:

1. Multiple installations: Pendant/surface mounted/wall-mounted/recessed/Track.

2. Modular design with convenient replacement.

3. High lumen efficiency,110lm/w.

4. Anti-glare design, UGR<19.

5. DALI, 0-10V dimming for options.

6. With emergency function available.

7. Up and down light effect for wall mount and pendant installation.

8. With Corner/ Cross/ Straight/ T shaped connectors for multiple shape design.


Application Areas:

It is mainly used for traditional suspended installation such as workshops, utility rooms, garages, and more.

Production Lead Time

7-14 days