LED Linear Light | Lights | Indoor Lighting
Mainland China
Product Specification
Certifications

CE/CB/ETL/DTC/SAA/FCC/GS/UL

Input Voltage(V)

AC220-240VAC/100-277VAC

THD

<15%

IP Rating

IP20/IP54

Lumen

4800lm-19800lm

PF

>0.95

Wires

5/8/12 core

Power

35W,50W,65W;70W,100W,150W...

Working Temperature

-20 - 65 ℃

Function

Dimmable(DALI/1-10V), Emergency, Sensor, Track Spot Light

Packing

Luminaire and Trunking rail are packed separately

Connector

L/T/X Node Connector can be choose

Trunk Rail Length

600mm, 1200mm, 1500mm, 2400mm, 3000mm

Lifespan (hours)

50000

UGR

<19

Light Color

Warm White, White, Cold White

Dimming

DALI, 1-10V, DIMswitch

Light Efficiency

160lm/w

Driver

Coreshine/Rubycon

Color

White, Black, Silver

CCT

3000K/4000K/5000K/6000K

Led Chip

Everlight/Samsung

Installation Method

Chain, Cord, Rod, Surface mounted

Beam Angle

25°;60°;90°;120°; Asymmetric; Double Asymmetric

CRI (Ra>)

80

Warranty

5 years

Product Description
Product Details
Coreshine S-LINE Led Linear Lighting System is an energy-efficient, low maintenance cost, and better alternative to traditional linear fluorescent in a variety of industrial, commercial, and light assembly applications.
  • Cost-effective light-line solution for industrial, commercial, and other applications
  • Good quality of light with high lumen output to meet different requirements 
  • Easy to install, reducing time, labor, packaging waste, and complexity
  • Flexible solution 
Length
Power
Lumen
Code No.
1200mm
30W
4800lm
CFL-1230-X1X2-X3WH
1200mm
40W
6400lm
CFL-1240-X1X2-X3WH
1200mm
60W
9600lm
CFL-1260-X1X2-X3WH
1500mm
35W
5600lm
CFL-1535-X1X2-X3WH
1500mm
50W
8000lm
CFL-1550-X1X2-X3WH
1500mm
70W
11200lm
CFL-1570-X1X2-X3WH
2400mm
60W
9600lm
CFL-2460-X1X2-X3WH
2400mm
80W
12800lm
CFL-2480-X1X2-X3WH
2400mm
120W
19600lm
CFL-24120-X1X2-X3WH
Return of Investment Comparison

We did a comparison test between Coreshine S-line and LED tube in the 300m² of warehouse

300 sq.m

UniteS-lineLED Tube
Lighting Effectlm/w160100
Qty of Luminaireset600960
Total Power ConsumptionKW3048
Unite Price of ElectricCNY/KWH1.5
Light TimeHour/Day1.2
Electric bill /dayCNY540.00864.00
Electric bill / monthCNY16,200.0025,920.00
Electric bill / yearCNY194,400.00311,040.00
Save the cost per yearCNY116,640.00

According to the simulation, the purchase cost will payback within 2 years

Why Choose Coreshine

CoreShine was founded in 2005 as one of the first LED lighting manufacturers in Shenzhen. In the beginning, we produced a variety of products like many other manufacturers, such as tubes, bulbs, 2G11 LED products to replace the traditional lighting. 

  • Established in 2005
  • Located in Shenzhen
  • Number of employees 200 staffs
  • 13,000 square meter 9 floors of workshop + 1 floor of office
  • Complete Industry Layout: R&D, Production, Marketing
  • Our Goal: To be World Leader of Linear Lighting System

Coreshine will continue to work in this product area and strive to become the absolute leader in the industry of the LED Linear trunking system in China.

R&D

  • Our R&D team has 9 engineers in the field of Electronics, Software, Mechanical, and Structure engineering. 
  • Their average industry experience is more than 10 years.

Production

  • More than 95% of our accessories are made by ourselves.
  • We have 156 production staff, and 60% of them have 3-5 years of lighting experience.
  • All our employees have professional training before going to work, and only 100% passed of the employees can be hired.

QC

  • Our QC department consists of 11 people, all of them are very experienced in this field. 
  • They will do all the finished product testing with 10% for each order, according to the strict inspection standards and instructions. Like Integrating Sphere test and so on.
Our Advantage
  • 5 years warranty
  • Toolless installation
  • Brand Components
  • Heat radiating area 106cm²/w
  • Longer warranty, Less maintenance
  • Rigorous technical
  • Quick connector 
  • Electrical safety design
  • Organized wiring
  • Modularity, integration structure
Production Lead Time

8 days