ERVAN IP66 LED Emergency Light UL SAA New SMD LED Emergency Light | Lights | Emergency Lighting
ERVAN IP66 LED Emergency Light UL SAA New SMD LED Emergency Light
Hong Kong
Booth: 1D-B20 | Hall of Aurora
Product Specification
Model No.

L07G-YJ 1500MM

Brand

ERVAN

Minimum Order Quantity

12piece(s)

Type of Payment

T/T

Port

Shenzhen

Colour

3000-7000k

Size

1500MM

Voltage(V)

AC100~277V

Certification

CE, EMC, LVD

Wattage(W)

65W

Warranty

3 year

Light Source

Espitar

Body Material

Aluminum, Polycarbonate (PC)

Is Dimmable

No

Power Source

AC

Including Bulbs

No

Switch Type

Touch Switch

Customized

Yes

Product Description
Description:
• LED emergency light with NI-MH battery, not only can be used as general lighting, but also be used as emergency light when the power is off.
• earn more time to save life, avoid chaos, necessary for each building.
• IP 66,waterproof, dust proof, pressure proof, corrosion proof, fits for different environment.
Features:
• 3 hours emergency lighting industry standard
• external driver with NI-MH battery.
• tri-proof led fixture for IP66 waterproof, dust,corrosion and pressure-proof.
• excellent heat dissipation expending on whole aluminum housing.
• high stability isolated driver.
• easy installation with clip
• No UV, No lead, No Mercury
• Test Button outside the emergency box for easy testing.

Application:
• Hotel, High building,Porch,outdoor,parking lot,garden,swimming pool,garage ,tunnel,play yard,farm yard...

Specifications of tube:
• Luminous: 7475lm ± 10%
• Luminous efficiency: 115lm/W
• Light source: Espitar
• Warranty: 3 years.
• Life span: 50,000 hours.
• Certificate:CE,Rosh
• Operating frequency: 50-60Hz.
• Power efficiency:≥0.87
• PC lens: clear and frosted optional
• CRI: ≥80
• Beam angle: 120°
• Working Temperature:-20~+40 Degree
• Working humidity;10%-80%
Parameter of emergency driver:
• Common power:20w,30w,40w
• Emergency time:>3hrs
• Emergency power:6.6w
• Emergency voltage:33V
Package:
• Net weight:4kgs/pcs.
• Dimension:150cm
• Packaging: 1pc/box, 6pcs/ctn.
• Carton measurement: 162*30*19cm.

Delivery time:
• 8-10days for samples, and 18-22 days for bulk.
• MOQ:3pcs.
Payment: L/C, T/T.

Production capacity: 30,0000pcs/month.

Installation:
• Easy installation: 1.Ceiling Mounted with clip 2.suspending with cable wire.
• FYI: when LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
• FYI: before the general using, pls make sure the test light is on.


Production Lead Time

12 days