Led Motion Sensor Ceiling Light | Lights
Led Motion Sensor Ceiling Light
Hong Kong
Product Specification
Model No.

L05G-MS microwave and motion sensor LED tube

Brand

ERVAN

Minimum Order Quantity

50 piece(s)

Type of Payment

T/T

Port

Shenzhen

Colour

customize

Size

1500mm

Voltage(V)

AC100~277V

Certification

CE, EMC, LVD, SAA

Wattage(W)

24W

Warranty

3 year

Base Type

G13

Body Material

Aluminum, Polycarbonate (PC)

Is Dimmable

Yes

Power Source

AC

Customized

Yes

Product Description
Description:

Motion Sensor Light tube L05G-MS with pir motionis is a 24 hour perfect lighting solution for home and office that uses energy efficient leds and daylighting to cut your energy use by up to 94%.

Feature:
  • integrated microwave sensor with driver 
  • hands-free lighting
  • high efficacy.
  • quick payback,cuts electricity use and lower power bills
  • ajustable 3 or 2 steps dimming control,combine Light and montion sensor
  • Latest and patented lockable rotating end cap.
  • safer with isolated power supply,Europe safety wired and one end power.
  • OEM,customized laser lable.
Application:
  • ideal for high-rise building, supermarket, parliament, offices, shopping malls, railway stations, airports, factories,public place etc.
  • Simple replacement for fluorescent tubes with fuse.
specification:
  • PC lens: clear or frosted 
  • Material: alu+ PC.
  • Light source: 3528SMD
  • Warranty: 3 years.
  • Certificate:Saa, CE,Rosh,ect.
  • Power: 24W.
  • Power energy saving: ≥80%.
  • Luminous: 2760lm ± 10%
  • LED number: 247pcs.
  • Input voltage: AC100-277V.
  • CRI: ≥80.
  • Luminous efficiency: 115lm/W.
  • Operating frequency: 50-60Hz.
  • Color temperature: 3000-7000k
  • Beam angle: 120°.
  • Life span: 50,000 hours.
Package:
  • Net weight:352g.
  • Dimension: Φ26 x 1498 (5ft).
  • Packaging: 1pc/box, 50pcs/ctn.
  • Carton measurement: 165 x 48 x 27cm.
Delivery time:
  • 10 days for samples, and 20 days for mass production.
  • MOQ: 100pcs.
Payment: L/C, T/T.
  • Production capacity: 20,0000pcs/month.
Installation:
  • When LED tubes are replaced in a standard fluorescent tube batten, the starter shold be removed, and replaced by the enclosed fuse.
  • Electronic ballast must be by-passed by a registered electrician for the safety.
Production Lead Time

12 days