Description:
L06G double-sided tube with more energy efficiency and more space saving as the single tube did the task of two. it is specially applicable for refrigerators, freezers,ATM ,subway, lighting box, adverting board lighting.
Feature:
- Double sided LED emitting allows a significant reduction of energy consumed as the single tube did the task of two.
- More energy efficiency and better space saving.
- High brightness: adopt high quality LED chip with 30mA current.
- Power saving:70%
- Special circuit design: each led works separately to avoid the situation when a single broken led affects the whole tube.
- Adjustable: Latest lockable rotating end cap (patent).
- Instant on: easy installation, no warm up time
- Life cycle:50,000hrs
- Warranty:5years
- Low maintenance: robust construction.
- Maintenance free
- Environmental- friendly: no UV, no lead, no mercury, no Buzzing, no Flickering
- No glass: Aluminum and + high strength PC cover, better heat dissipation
- Safe: High Shock/Vibration Resistance, Single end power anti electric shock, Isolated power.
Application:
- Ideal for refrigerator, Freezer, ATM, Lighting –Box, Subway, advertising boards
- replacement for conventional fluorescent tubes.
Certification: TUV, UL,VDE, DLC
Specifications:
- Light source:SMD3528LED
- Luminous :2300+-10%(Clear Lens) Frosted lens
- Voltage: AC100-277V
- Frequency: 50/60HZ
- Power Factor: >0.93
- Power Efficiency: >0.87
- THD:<20%
- Operating Temperature: -20°C to 40°C
- Storage Temperature: -40°C to 85°C
- Operating Humidity:10%-80%
- Storage Humidity: 10%-80%
- CRL: Ra: >80
- CCT: Warm White 3000k , daylight white 4000k, pure white 5500k, cool white 6500k
- Beam angle:240°
- PC lens: frosted/clear.
Package:
- Net weight: 368.2g.
- Dimension: Φ26 x 1198 (4ft).
- Packaging: 1pc/box, 50pcs/ctn.
- Carton measurement: 135 x 48 x 26cm.
- Pallet:14cartons/pallet
Payment: L/C, T/T.
Delivery:
- 10 days for sample
- 18 days for mass production.
- MOQ:50pcs
Installation:
- When LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
- Electronic ballast must be by-passed by a registered electrician.
Production Lead Time
20 days