San Wai Sewage Treatment Works, Phase 1 | Environmental Protection | Environmental Engineering | Waste, Recycling & Sewage Management
San Wai Sewage Treatment Works, Phase 1
Hong Kong
Booth: 3-G32 | Waste Management and Circular Economy
Product Specification
Product Description

Upgrading of the sewage treatment level from preliminary treatment to chemically enhanced primary treatment with disinfection; expansion of the treatment capacity to 200,000 cubic metre per day; construction of ancillary works including an administration building, a maintenance workshop, access roads and landscaping works.  Upgrading the treatment level of San Wai sewage treatment works will help to reduce pollution loads to the North-western Waters; and expansion of the treatment capacity will be able to cater for additional flows due to population growth in Northwestern New Territories.

Zhen Hua, being the local representative of China Harbour, via Group’s global network, has been contributing to the local infrastructure development for over 36 years.



改善污水處理水平,由基本處理提高至化學強化一級處理加消毒;把處理量擴充至200,000 立方米;建造附屬工程包括行政大樓、工場、通道及環境美化工程。工程項目將改善新圍污水處理廠的處理水平以減少西北水域所承受的污染量並增加該廠的處理量,以處理新界西北區人口增長帶來的額外污水量。

香港振華在過去36年來一直致力於當地的基礎設施建設。作為中國港灣的香港代表及中國交通建設集團的一員, 振華透過集團的全球性網絡及國家一帶一路政策所帶來的機遇, 在環保相關領域積極發展。