Office LED Tube | 燈飾 | 燈泡和燈管
香港
產品規格
產品型號

L05G-1200mm

品牌名稱

ERVAN

最低訂購數量

100 piece(s)

付款方式

Western Union, L/C, T/T

港口

Shenzhen

顏色

Warm White, Pure White, Daylight White, Cool White

尺寸

D26 x 1,198mm; 26 x 48"

電壓(伏)

AC100~277V

證書

歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證, 歐盟CE認證

功率(瓦)

20W

保養期

5 年

底座類型

G13

主體物料

鋁, 鋁

可調亮度

可以

電源

交流電

可定制

產品簡介
  • Material: aluminum, high strength PC.
  • High-brightness LED tube with easy installation and extended life.
  • Power: 20W.
  • Luminous: 2000lm±10%.
  • Luminous efficiency: 100lm/W.
  • Power factor: ≥0.95.
  • Power efficiency: 0.89.
  • Input voltage: AC 100 to 240V.
  • CRI: ≥80.
  • Power energy saving: ≥80%.
  • LED number: 216pcs.
  • Operating temp.: -20°-40°.
  • Operating frequency: 50 or 60Hz.
  • Input current: 58mA.
  • Latest lockable rotating end cap (patent).
  • Isolated power supply.
  • Europe safety wired.
  • One end power.
  • PC cover: transparent/frosted available.
  • Certificate: UL, TUV,VDE UL cUL, DLC.
  • Color temperature: 2,700-3,500K (warm white); 4,000-4,500K (daylight white); 5,000-6,000K (pure white); 7,000-8,000K (cool white).
  • Beam angle: 120°.
  • Life span: 50,000 hours.
  • Net weight: 368.2g.
  • Dimension: Φ26 x 1198 (4FT).
  • Packaging: 1pc/box, 50 pieces/carton.
  • Carton measurement: 135 x 48 x 26cm.
  • Latest lockable rotating end cap (patent).
  • No mercury.
  • Isolated power supply (very safe).
  • PC lens: clear/frosted.
  • Light source: SMD 3528/3020 high quality LED.
  • Warranty: 5 years.
  • Delivery time: 15 days for samples, and 30 days for mass production.
  • Payment: L/C, T/T.
  • Production capacity: 30,0000pcs/month.
  • MOQ: 10pcs.
  • Application: offices, shopping malls, railway stations, airports, factories, etc.
  • Simple replacement for traditional fluorescent tubes.
  • When LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
  • Electronic ballast must be by-passed by a registered electrician.
Installation:
  • Take off the power.
  • Take out the starter.
  • Take out the fluorescent tube.
  • Install the fuse supplied in the box.
  • Install the led tube.
  • Turn on the power.
生產所需時間

15