LED Pink Light for Meat Cabinet T8 Lighting Lamp 1200mm 20w | Lights | Light Bulbs & Tubes
LED Pink Light for Meat Cabinet T8 Lighting Lamp 1200mm 20w
Hong Kong
Product Specification
Model No.

L05G-R Led Pink Light For Meat Cabinet

Brand

ERVAN

Minimum Order Quantity

100 piece(s)

Type of Payment

T/T

Port

Shenzhen

Colour

Pink

Size

600MM 1200MM 1500MM 1800MM

Voltage(V)

AC100~277V

Certification

CE, EMC, LVD, RoHS

Wattage(W)

20W

Warranty

3 year

Base Type

G13

Body Material

Aluminum, Polycarbonate (PC)

Is Dimmable

No

Power Source

AC

Customized

Yes

Product Description

LED pink light for meat cabinet t8 lighting lamp 1200mm 20w features:
• Show the best result with pink color for meat displays
• Patented 180 Deg rotating end cap design for the best lighting result
• Single end power anti electric shock ensures safety
• Maximum efficacy and minimum glare
• Attractive design with color ring.
• Isolating driver inside
• High energy saving, >60% reduce building carbon footprint, up to 5times longer life with no replacements reducing maintenance costs. Quick pay back.
• Life span: 50000 hours average operating life.
• Warranty:3years
Specification:
• Luminous: 2300lm ± 10%(frosted cover)
• Luminous efficiency: 115lm/W.
• Light source: SMD3528LED.
• LED number: 216pcs
• Power efficiency: ≥0.92.
• Power energy saving: ≥80%.
• Power factor: ≥0.95.
• THD:<20%
• CRI: ≥80.
• Color temperature: pink
• Input voltage: AC 100 to 277V.
• Operating frequency: 50 or 60Hz.
• Beam angle: 120°.
• PC lens: clear&frosted available.
Application:
• Offices, exhibition hall, residence, library, hospital, school, shopping malls, railway stations, airports, factories, etc.
• Ideal for the replacement of fluorometer.
Certification: TUV, CE, SAA, Rosh

Temperature and humidity:
• Operating temperature: -20~+40℃
• Storage temperature: -40~+85℃
• Operating humidity: 10%-80%
• Storage humidity: 10%-80%
Package:
• Net weight: 0.6kg.
• Dimension: 26x1198mm
• Packaging: 1pc/box, 5pcs/ctn.
• Carton measurement: 1320*340*220mm.
Installation:
• Easy installation when replace the fluorometer with the ervan fuse
• Single anti power, insure safety
Payment: L/C, T/T.

Delivery:
10 days for sample
20 days for mass production.
Production Lead Time

15 days