Feature &Advantage:
- 120lm/w| Energy-efficient
- No UV; NO lead| No Mercury,Environmental-friendly
- Using indirect lighting| downy light and visually comfortable
- Optical PMMA light guide| Illuminance Uniformity
- AL6063-T5 Aluminum frame| better heat dissipation
- Concise interior space design and slim profile| look attractive, easy to clean and less likely to dirt,fast and simple installation, fits into most ceiling grid types.
- Maximume icacy and minimum glare| no eye strain or discomfortable
- Panels utilise high quality, high flux SMDLED's|energy saving>60% to dramatically reduce building carbon footprint,up to 5 times longer life with no replacements reducing maintenance costs. quick payback.
- More than 50,000hours average operating life.
specification:
- Luminous: 4800lm ± 10%.
- Luminous efficiency: 120lm/W.
- Light source: SMD2835LED.
- LED number: 108pcs
- Power efficiency: ≥0.92.
- Power energy saving: ≥80%.
- Power factor: ≥0.95.
- THD:<20%
- CRI: ≥80.
- Color temperature:2700-3500K; 4000-4500K; 5000-6000K; 7000-8000K
- Input voltage: AC 100 to 240V.
- Operating frequency: 50 or 60Hz.
- Beam angle: 120°.
- PC lens: frosted available.
- Life span: 50,000 hours.
- Warranty:5years
Application:
- offices, exhibition hall,residence, library, hospital, school, shopping malls, railway stations, airports, factories, etc.
Certification: TUV, CE,SAA
Temperature and Humidity:
- Operating temperature:-20~+40℃
- Storage temperature:-40~+85℃
- Operating humidity:10%-80%
- Storage humidity:10%-80%
Package:
- Net weight:3.6g.
- Dimension: 595*595mm
- Packaging: 1pc/box, 5pcs/ctn.
- Carton measurement: 720*640*220mm.
Installation:
- Built-in the wall(standard installation)
- Suspending(need Accessories)
- Ceiling Mounted(need accessories)
Payment: L/C, T/T.
Package:
- 10 days for sample
- 20 days for mass production.
Attention:
- Lamps should be installed, connected and tested by a certified installer based on the local regulations.
- Pls check local voltage in accordance with the product requirement.
- Relamping only can be done when the power is off and the lamp is completely cooled down.
- When a lamp is to be cleaned, make the power off and let it cool down completely. Clean the fixture with a soft cloth and a standard PH Neutral detergent.
- Do not cover the fixtures with flammale materials.
Production Lead Time
10 days