Office LED Tubelight | Lights | Light Bulbs & Tubes
Office LED Tubelight
Hong Kong
Booth: 1D-B20 | Hall of Aurora
Product Specification
Model No.

L05G-1200mm

Brand

ERVAN

Minimum Order Quantity

100 piece(s)

Type of Payment

L/C, T/T

Port

Shenzhen

Colour

Warm White, Pure White, Daylight White, Cool White

Size

D26 x 1,198mm

Voltage(V)

AC100~277V

Certification

CE, EMC, FCC, LVD, RoHS, UL, VDE

Wattage(W)

20W

Warranty

5 year

Base Type

G13

Light Source

LED TUBE

Body Material

Aluminum, Polycarbonate (PC)

Is Dimmable

Yes

Power Source

AC

Including Bulbs

No

Customized

Yes

Product Description
  • Material: aluminum, PC.
  • High-tech LED tube design with the latest lockable rotating end cap (patent).
  • Europe safety wired with one end power and isolated power supply.
  • PC cover: transparent/frosted available.
  • Certificate: TUV, UL,VDE, DLC
  • Power: 20W.
  • Power energy saving: ≥80%.
  • Luminous: 2300lm ± 10%.
  • LED number: 216pcs.
  • Input voltage: AC 100 to 240V.
  • CRI: ≥80.
  • Luminous efficiency: 115lm/W.
  • Operating temp.: -20°-40°.
  • Power factor: ≥0.95.
  • Power efficiency: 0.89.
  • Operating frequency: 50 or 60Hz.
  • Input current: 58mA.
  • Color temperature: 2,700-3,500K (warm white); 4,000-4,500K (daylight white); 5,000-6,000K (pure white); 7,000-8,000K (cool white).
  • Beam angle: 120°.
  • Life span: 50,000 hours.
  • Net weight: 368.2g.
  • Dimension: Φ26 x 1198 (4ft).
  • Packaging: 1pc/box, 50 piece(s)/ctn.
  • Carton measurement: 135 x 48 x 26cm.
  • Latest lockable rotating end cap (patent).
  • No mercury.
  • Isolated power supply (very safe).
  • PC lens: clear/frosted.
  • Light source: SMD 3528/2835 high quality LED.
  • Warranty: 5 years.
  • Delivery time: 10 days for samples, and 20 days for mass production.
  • Payment: L/C, T/T.
  • Production capacity: 300,000 piece(s)/month.
  • Application: offices, shopping malls, railway stations, airports, factories, etc.
  • Simple replacement for traditional fluorescent tubes.
  • When LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
  • Electronic ballast must be by-passed by a registered electrician.
Production Lead Time

10 - 15 days